Tuvalu

Location

Funafuti
Tuvalu
8° 31' 0.012" S, 179° 13' 1.2" E
Capital City: 
Funafuti (Fongafale)
Languages: 
Tuvaluan, English
Category: Land
Indicator 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Source
Agricultural land (1000 Ha) 2 1.7 1.7 1.7 1.7 1.7 1.7 1.8 1.8 FAO
Forest area (sq km) 10 10 10 10 10 10 10 10 World Bank
Forest area (% of land area) 33.33 33.33 33.33 33.33 33.33 33.33 33.33 33.33 World Bank
Category: Demographics
Indicator 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Source
Country population 10,441 World Bank
Population annual growth World Bank
Maternal mortality ratio (modeled estimate, per 100,000 live births) World Bank
Category: Social
Indicator 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Source
Seats held by women in national parliament, percentage UN Stats (MDGs indicators)
Literacy rate, adult total (% of people ages 15 and above) World Bank
Category: Indices
Indicator 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Source
HDI - Human Development Index UNDP International Human Development Indicators - Calculated based on data from UNDESA (2009d), Barro and Lee (2010), UNESCO Institute for Statistics (2010b), World Bank (2010b) and IMF(2010a).
Category: Economy
Indicator 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Source
GNI per capita, PPP (current international $) World Bank
Category: Energy
Indicator 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Source
Electric power consumption (kWh) World Bank
Combustible renewables and waste (metric tons of oil equivalent) World Bank
Fossil fuel energy consumption (% of total) World Bank
Category: Freshwater
Indicator 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Source
Improved water source (% of population with access) 94 96 97 World Bank
Category: Biodiversity
Indicator 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Source
Proportion of terrestrial and marine areas protected 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 UN Stats (MDGs indicators)

Coming soon.

Country Strategies: 
Title Programme Name Programme Description Year
Energy Strategy - Tuvalu Pacific Regional Energy Assessment 2004: Tuvalu 2004
UNFCCC Nat Comm - Tuvalu Initial national communication under the United Nations Framework Convention on Climate Change. Strategy Description 1999
NAPA - Tuvalu Tuvalu’s National Adaptation Programme of Action Strategy Description 2007
NBSAP - Tuvalu Tuvalu National Biodiversity Strategy and Action Plan: Fourth National Report to the Convention on Biological Diversity Strategy Description 2009
NSDS - Tuvalu National Strategy for Sustainable Development 2005-2015 Strategy Description 2005
07 Aug 2012 | SIDS Policy and Practice
2 August 2012: The Pacific Plan Action Committee (PPAC) held a meeting ahead of the 43rd Pacific Islands Forum (PIF 43), to monitor progress on elements of the Plan. The 2012 Annual Pacific Plan Progress Report was presented to the Committee. The Report is based on progress reports from the PIF Secretariat (PIFS) and other members of the Council of Regional Organisations in the Pacific (CROP) as well as international agencies. It addresses issues relating to education, tourism and trade, among...
02 Aug 2012 | SIDS Policy and Practice
19 July 2012: Germanwatch launched a website addressing loss and damage caused by climate change, aiming to support Least Developed Countries (LDCs) in calling for action on the issue. The topic is increasingly relevant for LDCs, Germanwatch notes, as agreement to deliver mitigation commitments in line with staying below 2°C/1.5°C has not been yet achieved. The website is part of the “Loss and Damage in Vulnerable Countries Initiative,” which runs from February 2012 through March...
31 Jul 2012 | SIDS Policy and Practice
1 July 2012: The Pacific Adaptation to Climate Change (PACC) project is addressing water issues in the Marshall Islands by installing water meters and improving the Airport Water Reservoir, the Secretariat of the Pacific Regional Environment Programme (SPREP) has reported. The Majuro Water and Sewer Company, via an agreement with PACC, is funding the Reservoir work and providing 11 bulk meters, a leak locator and a flow meter. According to PACC’s 2009 In-Country Consultation Report, the...
External Resources: 

Coming soon.